Wood Fence vs Vinyl Fence Material Cost Per Foot
Wood usually costs less per linear foot than vinyl on materials alone. Here is how to build both order lists and compare them fairly.
To find how many fence posts you need, divide the total run by 8 ft and add one for the end, plus extras for gates and corners.
To determine how many fence posts you need, first measure the total length of the fence line in feet. Use a long tape or a measuring wheel and follow the exact path the fence will take, including any corners. Write down the measurement in feet and inches, then convert to decimal feet. For example, a run of 100 ft 6 in becomes 100.5 ft. If your fence has multiple straight sections, measure each separately and add them together. This total length is the basis for calculating posts, panels, and rails.
The fence calculator uses this total run to work out the number of posts. It assumes posts are spaced at 8 ft centres, which is standard for many US fence types. However, always check local building codes or manufacturer instructions for your specific fence material, as spacing can vary. For instance, some vinyl or composite fences may require closer spacing in high-wind areas. Confirm with your local building department or supplier before finalizing.
The basic formula for post count is: number of posts = (total run in feet ÷ 8) + 1. The extra post accounts for the end of the run. For example, a 100 ft straight run gives 100 ÷ 8 = 12.5, which rounds up to 13, plus 1 equals 14 posts. The calculator rounds up to ensure you have enough posts, because you cannot have a fraction of a post. This method assumes the first post is at the start and the last post is at the end, with intermediate posts every 8 ft.
In practice, the last bay may be shorter than 8 ft to close the run neatly. The calculator handles this by treating the final post as the closing post. For a 100 ft run, you would have 13 bays of 8 ft (104 ft) if you used 14 posts, but that overshoots. Actually, with 14 posts, you have 13 spaces; 13 × 8 = 104 ft, which is 4 ft longer than needed. So the calculator adjusts the last bay to 4 ft. This is called a closing bay. Always plan for a closing bay rather than cutting posts or leaving a gap.
Gates require additional posts. Each gate opening needs a post on each side, and these posts are often heavier or set deeper. The calculator adds two posts per gate. For example, a 100 ft run with one 4 ft gate: the gate interrupts the fence line, so you effectively have two runs. Suppose the gate is at one end; then you have a 96 ft run plus a gate. The 96 ft run needs (96 ÷ 8) + 1 = 13 posts, and the gate adds 2 posts, but one post is shared with the run, so total is 14 posts. The calculator simplifies by adding 2 posts per gate to the base count. Always confirm gate post requirements with your local code or supplier.
Corners also need a post, but the standard formula already includes a post at each end of a straight run. If your fence turns a corner, that corner post is counted as the end post of one run and the start post of the next. So when measuring multiple runs, add the lengths together and apply the formula once. For example, an L-shaped fence with runs of 50 ft and 30 ft: total 80 ft, posts = (80 ÷ 8) + 1 = 11. This includes the corner post. The calculator uses this approach, so you don't double-count corner posts.
Suppose you have a straight 120 ft fence line with one 4 ft gate in the middle. First, calculate the base posts for the entire run as if no gate: (120 ÷ 8) + 1 = 16 posts. Then add 2 posts for the gate, giving 18 posts. However, the gate splits the run into two sections, each with its own end post. In reality, you would have a post at each side of the gate, which are already counted in the 16, so you only need to add the gate posts if they are not at 8 ft spacing. The calculator adds 2 posts per gate to be safe. So it outputs 18 posts. For materials, you also need panels: 120 ÷ 8 = 15 panels, but with a gate, you might need 14 panels plus the gate. The calculator outputs panels, rails, and concrete bags based on these numbers.
Using the default post hole size of 254 mm diameter by 762 mm deep, each hole requires about 0.017 m³ of concrete per 80 lb bag. Convert to feet: 254 mm is about 10 in, 762 mm is 30 in. The volume of a cylindrical hole is π × (radius)² × depth. Radius = 5 in = 0.4167 ft, depth = 2.5 ft. Volume = 3.1416 × 0.1736 × 2.5 ≈ 1.36 ft³. An 80 lb bag yields about 0.6 ft³, so you need about 2.27 bags per hole, round up to 3 bags. For 18 posts, that's 54 bags. The calculator automates this, using the metric bag yield you provided (0.017 m³ per 80 lb bag) and converting to your units.
Post spacing, hole depth, and concrete requirements can vary by location and fence type. In the US, always check with your local building department for permit requirements and frost depth, which affects hole depth. For example, in cold climates, post holes may need to be deeper than 762 mm to prevent frost heave. Also, supplier recommendations for concrete may differ; some fast-setting mixes yield different volumes. The calculator uses the default values you provided, but you should adjust them if your local code or product specifies otherwise. Confirm with your supplier the number of bags needed per hole, as bag yield can vary by brand.
The fence calculator is a tool to help you estimate quantities, but it is not a substitute for professional advice. Always verify your measurements and local requirements before purchasing materials. For gates, ensure gate posts are sized and set according to the gate manufacturer's instructions, as they may require larger posts or deeper footings. By following these steps and using the calculator, you can confidently answer how many fence posts you need and complete your order list.
For a straight 100 ft fence with 8 ft spacing, you need 14 posts: (100 ÷ 8) = 12.5, round up to 13, plus 1 for the end. If you have gates, add 2 posts per gate. Always check local codes for specific spacing requirements.
In the US, 8 ft (2.44 m) is common for many fence types, but spacing can vary. Some materials or high-wind areas may require 6 ft or 10 ft. Confirm with your local building department or fence manufacturer for the correct spacing for your project.
Using a 254 mm (10 in) diameter hole, 762 mm (30 in) deep, you need about 1.36 ft³ of concrete. An 80 lb bag yields about 0.6 ft³, so plan on 3 bags per post. However, bag yield varies by brand, so check the bag label or ask your supplier.
Corner posts are included in the basic formula if you measure the total run and add 1. Gates require 2 additional posts, one on each side. The fence calculator adds 2 posts per gate. Always confirm gate post requirements with your gate manufacturer or local code.